Categories
pictures

The House is Coming Along

It’s been about two months since we last went to visit the construction of our house at the Glen LA.   Last time we were there, we could only get up to the living room level as the stairs up to the third level were built but the third level itself wasn’t done.   Well, both the third level and roof deck are now fully built with stairs connecting everything.  It’s awesome.  Still a ways to go, and fingers crossed that the construction completes in the October timeframe.  What was cool was seeing that a lot of the plumbing has been installed as were some of the bath fixtures, such as the showers and tub in all the bathrooms.  I know I needed to see this as it put me in a great mood, reminding me of the awesomeness to come.   See for yourself:

GlenLA construction update – May 20, 2018:

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.